Time: But earlier this year, Palin missed an opportunity to help the US mainland obtain billions of cubic feet of natural gas from Alaska's Cook Inlet. Her support of an effort by major energy producers to export the fuel to more lucrative markets in Asia came just as a facility that will provide the first practical way to bring the state's natural gas to the lower 48 states was set to open on the Baja coast in Mexico.

Cook Inlet's natural gas has been exported for years, and until this past spring, it pretty much had no alternative. Without a pipeline or even facility to receive natural gas on the West Coast, it had no way of reaching the lower 48 states. As a result, producers sent whatever wasn't used locally — 28% of total output last year — to a Liquified Natural Gas (LNG) plant on the Kenai Peninsula, where gas was chilled to a liquid state and put on tankers for Japan and other Pacific rim countries.

But since this past May, some of Alaska's gas could have wound up in domestic hands. San Diego-based Sempra Energy opened the first LNG terminal on the West Coast of North America. The Mexican facility, a $975 million project, is tied directly to the gas pipeline system that leads to California, Texas and Arizona.

The Alaskan LNG plant is owned by Marathon Oil and ConocoPhillips, which asked the Department of Energy in 2007 for permission to export about 100 billion cubic feet of gas to Asia over two years from the roughly 300 billion cubic feet of gas that is likely to be produced. The overseas connection not only provides an outlet for fuel produced beyond the limited needs of Alaska, it is highly profitable — LNG prices in the Pacific rim can run twice as high as those in the US.

Palin personally intervened in April, 2007, but her concerns were strictly local. She asked DOE to condition its approval on guarantees that gas needed in Alaska not be diverted to the better-paying foreign venues — a position she held until this past January, when the producers reached separate agreement with the state to meet its needs.

At no time did Palin or her government cite the desire to preserve Alaskan gas for the lower 48 states.
The Sempra terminal began operations just four months after Palin announced unconditional support for the Marathon and ConocoPhillips request and a month before DOE approved their plans to export gas to Asia. The development of the Mexico plant was well-known and much anticipated in energy circles.